        BLACKLA W                Erosion and Sediment Controls                  Phone: 07 5442 3300
         CIVIL CONTRACTORS                                                       Fax: 07 5442 3399
14 4
   "1- 1--1'1._..-;';' "-                   QMS 074                                      Email:
                                                                            [email protected]
     100 Sandalwood Lane             Rock Filter Dams                              ABN 77 106 750 724
    Forest Glen QLD 4556


Purpose:
  Provide a standard procedure for the installation of rock filter dams to trap sediment in
  well defined gullies, excavated pits and overland flow paths.

Materials Required
•   200-350mm hard, erosion resistant rock
n   25mm aggregate
•   Geofabric

Procedure:

Installation

The size of a rock filter dam will vary
depending upon the site. General
guidelines are:
    Minimum top width 200mm
    Maximum height 1 m
    Maximum side slopes
      Upslope face
      2 (horizontal): 1 (vertical)
      Down slope face                                          Figure 1. Rock Filter Dam
      3 (horizontal): 1 (vertical)
                                                                                          Geotextile filter fabric
                                                                                          wrapped around rock
Place support rock, lay geofabric over                                                    and keyed in at the
support rock.                                                                             bottom



Place 200mm of 25mm aggregate over
filter fabric, then key 200mm into rock

Rock filter dams should be keyed in to a             200mm- 350mm rock
                                                     keyed in 200mm into
minimum depth of 200mm                               natural ground


Centre of rock filter dam should be a                      Figure 2 Rock Filter Dam key in
minimum of 200mm lower than the outer
edge to form a spillway

Maintenance

Rock filter dams require little
maintenance for short-term construction
work sites.

Excessive sediment should be removed
from upstream of the dam, if in place for
longer periods of time.
    Rock Filter Dams                         Document Number                                Page 1 of 1
    Issue Number 1 July 2008                    QMS 074                    Authorised by: C. Gursanscky

Used in these records

About this file

File size
57.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plans for approval - Bunnings Warehouse.pdf · 57.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.