Council archive · source document
Operational Works Application OPW17-0561 · OPW17/0561
Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
ensure that all workers understand the sensitivity of the site, the importance of preserving the vegetation and the need to minimize noise, dust and other building activity impacts on adjacent home owners and the public. e The working area will be minimized to protect any significant vegetation REMOVAL OF BUILDING WASTE Building waste will be collected in a garbage trailer or light truck situated adjacent to the garage of No. 10 Park Road. Sand spoil will be lowered daily from the terrace platform to the garbage trailer or light truck located adjacent to the garage of No.10 Park Road. EROSION AND SEDIMENT CONTROL Erosion and Sediment Control is considered for both work areas as summarised below: e The driveway to park Road will require silt fences to be installed to the perimeter of the works. Sand bags will be placed in the gutters during excavation and concreting to prevent runoff into the Council storm water system. e Erosion and Sediment Control for the proposed terrace will require a silt fence to the perimeter of the proposed footing excavation. e The permanent storm water drainage system will be connected to the Council system as an early works operation to prevent any concentrations of runoff discharging onto the sand slope. Environmenial Controls Plan to prevent pollution from concreting operations during the construction (Grouting & Pile Caps) Background. The use of concrete materials is reduced to a minimum due to the use of a micro piling system which is to be craned onto site. The small volumes of concrete required allow the use of a small concrete grout pump with reduced line size to grout piles and concrete pile caps. This system gives precise control to the operators making spillage and cleaning requirements negligible. Controls: The builder/site manager will ensure the following best practice sediment control measures including a designated wash down area are in place before work starts and are adequately maintained throughout construction. e The designated wash down area is to be located within the site on the existing paved driveway with sediment control screening in place and an appropriate HDP waste receptacle drum will be available to retain any sediment waste from swept up spillage or cleaning of equipment.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW17-0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.