Operational Works Application OPW17-0561 · OPW17/0561

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

The receptacle drum will be exchanged as required, fitted with a sealed lid
and the contents removed from site regularly to the concrete supplier's
authorised off site recycling and disposal facility.

The builder/site manager will ensure all workers on the site are aware of
their responsibilities to minimise pollution including the concrete pump
operator who will directly monitor equipment to ensure leakage and spillage
does not occur.

The concrete supplier will selected on the basis that appropriate training has
been provided to their agitator truck drivers, and that they provide
appropriate details and resources to enable them to complete a delivery
without causing pollution.

The agitator truck driver who will be required to be familiar with the
Concrete Safe Site Delivery Guidelines (available from Cement Concrete &
Aggregates Australia at www.concrete.net.au under ‘A-Z Directory’) and will
have sufficient training and experience to deliver concrete to site and then
return to the batch plant without causing environmental harm through
spillage or leakage of concrete.

The driver will inspect and maintain the truck at ali times and will be
instructed to raise any concerns about the pollution controls on site with the
builder/site manager.

The driver must also ensure sediment is not tracked off site. If this occurs, it
will be swept up and put back into on site sediment receptacle drum.

Where possible, the delivery of concrete will occur within the site, using
small trucks, to ensure the risk of spillage contaminating the stormwater
system is minimised.

If site access is restricted and the delivery of concrete must occur on the
Street, appropriate sediment controls will be in place before pouring begins.

The builder/site manager will ensure that all appropriate sediment controls
are in place before the concrete pour starts.

Any spillage that does occurred during the delivery procedure will be swept
up before removing the sediment controls and concrete spillage will not be
hosed into the stormwater system.

Chutes, barrels, wheelbarrows and other equipment will be rinsed in the site
wash-down area.

To minimise the amount of wash-down water generated, excess concrete
will be scraped off equipment before it is washed.

Water in the wash down area will be contained and recycled as required and
not allowed to flow into the stormwater system.

Excess concrete will be returned back to the supplier’s depot.

The chute contents will be washed into the sediment receptacle drum and
sealed with a lid before leaving the site.

Used in these records

About this file

File size
26.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW17-0561.pdf · 26.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.