Council archive · source document
Operational Works Application OPW17-0561 · OPW17/0561
Very large file (26.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
The receptacle drum will be exchanged as required, fitted with a sealed lid and the contents removed from site regularly to the concrete supplier's authorised off site recycling and disposal facility. The builder/site manager will ensure all workers on the site are aware of their responsibilities to minimise pollution including the concrete pump operator who will directly monitor equipment to ensure leakage and spillage does not occur. The concrete supplier will selected on the basis that appropriate training has been provided to their agitator truck drivers, and that they provide appropriate details and resources to enable them to complete a delivery without causing pollution. The agitator truck driver who will be required to be familiar with the Concrete Safe Site Delivery Guidelines (available from Cement Concrete & Aggregates Australia at www.concrete.net.au under ‘A-Z Directory’) and will have sufficient training and experience to deliver concrete to site and then return to the batch plant without causing environmental harm through spillage or leakage of concrete. The driver will inspect and maintain the truck at ali times and will be instructed to raise any concerns about the pollution controls on site with the builder/site manager. The driver must also ensure sediment is not tracked off site. If this occurs, it will be swept up and put back into on site sediment receptacle drum. Where possible, the delivery of concrete will occur within the site, using small trucks, to ensure the risk of spillage contaminating the stormwater system is minimised. If site access is restricted and the delivery of concrete must occur on the Street, appropriate sediment controls will be in place before pouring begins. The builder/site manager will ensure that all appropriate sediment controls are in place before the concrete pour starts. Any spillage that does occurred during the delivery procedure will be swept up before removing the sediment controls and concrete spillage will not be hosed into the stormwater system. Chutes, barrels, wheelbarrows and other equipment will be rinsed in the site wash-down area. To minimise the amount of wash-down water generated, excess concrete will be scraped off equipment before it is washed. Water in the wash down area will be contained and recycled as required and not allowed to flow into the stormwater system. Excess concrete will be returned back to the supplier’s depot. The chute contents will be washed into the sediment receptacle drum and sealed with a lid before leaving the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application OPW17-0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.