Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

OPW052025 Report - Part 2

Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Performance outcomes                                                 Acceptable outcomes                                                                             Response

                                                                     Editor’s Note—Water supply capacity for fire fighting purposes is
                                                                     in addition to water supply capacity for other uses and activities on
                                                                     the premises.


Essential Community Infrastructure
PO4                                                                  AO4.1                                                                   Not Applicable as no essential community infrastructure is
Essential community infrastructure is able to function effectively   Development involving essential community infrastructure is not         proposed.
during and immediately after bushfire events.                        located within a medium or high bushfire hazard area.

                                                                     OR

                                                                     AO4.2
                                                                     Where located in a medium or high bushfire hazard area,
                                                                     development involving essential community infrastructure is
                                                                     designed to function effectively during and after a bushfire event in
                                                                     accordance with a Bushfire Hazard Management Plan.

                                                                     Editor’s Note— PSP8 Natural Hazards provides guidance for
                                                                     assessing bushfire hazard risk and preparing a bushfire hazard
                                                                     management plan.
Hazardous Materials
PO5                                                                  AO5                                                                     This item is not applicable as no hazardous materials will
Public safety and the environment are not adversely affected by      Hazardous materials are not manufactured or stored in bulk in a         be stored onsite.
the impacts of bushfire on hazardous materials manufacturing         bushfire hazard area.
or storing in bulk.
Log in to download the original file

OPW052025 Report - Part 2.pdf · 17.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.