OPW052025 Report - Part 2

Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

1.            Introduction
This report details the results of a geotechnical investigation undertaken for a proposed driveway and
residence at 146 Middle Creek Road, Federal. The investigation was performed by Tectonic for
Oceantobush Pastoral Trust, generally in accordance with Proposal P225047-Rev0, dated 3 February
2025. Subdivisions (Qld) Pty Ltd (SQ) are the consulting civil engineers for the driveway layout.
The geotechnical investigation comprised a site walk-over survey by an experienced engineering
geologist, excavation of test pits at two locations and a ‘scrape’ into a selected existing sideslope; and
laboratory testing. This report summarises the results of our investigation and includes a slope stability
assessment and recommendations regarding geotechnical matters for the proposed driveway and
residence, pertaining to the future building locations, earthworks, retaining structures, footings and
drainage.



2.            Proposed Development
A concept layout sketch had been prepared by SQ at the time of the investigation which indicated initial
concepts for the driveway alignment. The driveway would extend from the existing entry point to the
east at the frontage to Middle Creek Road, then extend mostly following the ridgeline of a natural spur
along the southern edge of the block, then to the north-western corner. A short section to the south of
the existing driveway alignment, just prior to the final rise up to the house site (Ref. below) was
constructed sidelong across a short section. It is understood that no further notable earthworks would be
undertaken, with the driveway largely to follow an existing track. Localised works may be required to
facilitate site preparation, grading and drainage however this is not anticipated to exceed about 0.5 m
depth/height of cutting/filling.
The proposed residence would be located on an elongated knob in the north-west corner, one of the
highest topographical points within the allotment. The crest of the knob was relatively wide, and very
gently sloping. Therefore, minimal earthworks are anticipated to facilitate the construction of the house,
which we understand would be a relatively lightweight building, suspended on short posts. The site does
not have access to a potable mains water supply or sewerage, and therefore on-site collection of
rainwater in tanks as well as on-site effluent disposal will be required
The supplied sketch for the driveway, including annotations discussed on site, is presented below in Text
Figure 1 on the following page.




Geotechnical Investigation & Slope Stability Assessment
9 April 2025 | 25050-001-Rev0                                                                                1
Log in to download the original file

OPW052025 Report - Part 2.pdf · 17.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.