Total runoff volume across NE
boundary (Node A outflow) = 11.36m3
Peak flow rate across
NE boundary = 30L/s
Figure 5 – XP Storm Results; Post-Developed Model (1% AEP, 10 minute duration)
4 W AT ER Q U AL IT Y M AN AG E M ENT
4. 1 O pe r at io na l Ph a se
The proposed development is not required to meet the QLD Government’s State Planning Policy (July
2017) as the site area does not exceed 2500m2. However, stormwater quality management must still
be undertaken via the application of best management practices (BMP’s) to ensure no adverse impacts
to the downstream environment.
Pollutants typically generated during the operational phase of the development include:
Litter/gross pollutants;
Sediment;
Nutrients (N & P);
Hydrocarbons (oils and grease); and
Heavy metals.
Stormwater quality best management practices may be implemented for the development as follows:
First flush diversion system for roof water diverting the roof water for irrigation purposes
Gross pollutant filter baskets in field inlet pits collecting runoff from ground areas.
Best management practices have been deemed sufficient for the site area and land use. Refer to
Appendix B for the stormwater management drawing.
11 June 2020 Stormwater Management Report 7
S20-023 40 Park Crescent, Sunrise Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.