Table 3 below compares the peak flow rates and total runoff volume for the existing and developed
model.

Table 3 - XP Storm Results

          Duration                          Peak Flow Rate (L/s)              Total Volume (m3)
 AEP                  Median Storm
           (min)        Pattern            Existing       Developed        Existing      Developed

 10%           10            8                21             16 (-5)         8.41        4.48 (-3.94)

               25            5                16             12 (-4)         14.94       9.70 (-5.24)

               60            6                13             10 (-3)         23.10       16.54 (-6.57)

  1%           10            8                32             30 (-2)         15.35       11.36 (-3.99)

               25            10               28             25 (-3)         27.44       21.67 (-5.77)

               60            6                24             23 (-1)         43.42       35.91 (-7.51)

As shown in Table 3, the peak flow rate of stormwater runoff and the total runoff volume off site has not
increased as a result of the development. The proposed infiltration/detention tank is therefore
considered to be adequate. Results for the 10 minute duration for the 1% AEP event are outlined in
Figure 4 & 5 below.



     Total runoff volume across NE
     boundary (Node A inflow) = 15.35m3




                                                   Peak flow rate across
                                                   NE boundary = 32L/s


       Figure 4 – XP Storm Results; Pre-Developed Model (1% AEP, 10 minute duration)




11 June 2020                           Stormwater Management Report                                      6
S20-023                              40 Park Crescent, Sunrise Beach

Used in these records

About this file

File size
7.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment B - Stormwater management Report.pdf · 7.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.