4. 2 Con st ruc t io n Ph a se
Management of stormwater runoff during construction and the implementation of an erosion & sediment
control program is necessary to avoid impacts to receiving waters from pollutants typically generated
during the construction phase. Typical pollutants are described in Table 6 below:
Table 4 – Pollutants Typically Generated During the Construction Phase
Pollutant Sources
Litter (Gross Pollutants) Paper, construction packaging, food packaging, cement bags.
Sediment Unprotected exposed soils and stockpiles during earthworks and building.
Hydrocarbons Fuel and oil spills, leaks from construction equipment.
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, wash waters.
pH altering substances Acid sulphate soils, cement slurry and wash waters.
In addition to the degradation of receiving waters, impacts of inadequate erosion and sediment control
downstream from the site include:
traffic safety problems;
blocked drains;
local flooding problems;
aesthetic pollution of drainage paths; and
damage to local ecosystems.
4.2.1 De si gn O bj e ct iv es
Management of stormwater runoff during construction should be undertaken in accordance with
Appendix 2 of the SPP (July 2017). The SPP outlines the design objectives for construction phase
stormwater management. These are presented in Table 5, Table 6 and Table 7.
Table 5 – SPP Appendix 2: Part 1 Construction Phase – Stormwater Management Design Objectives
Issue Desired Outcomes
Drainage Control 1. Manage stormwater flows around or through areas of exposed soil to
avoid contamination.
2. Manage sheet flows in order to avoid or minimise the generation of rill or
gully erosion.
3. Provide stable concentrated flow paths to achieve the construction
phase stormwater management design objectives for temporary
drainage works (part 2).
11 June 2020 Stormwater Management Report 8
S20-023 40 Park Crescent, Sunrise Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.