Council archive · source document
Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239
Plans and drawings: the text below has words only, no drawings.
mcnab construction
07-DOC-003 Rev 4
4.6 McNab Personal
All McNab Personnel are responsible for carrying out their work in accordance with the McNab’s
stated Environmental Policy and Objectives, the EMP and as instructed by the Foreman.
I will adhere to the relevant Environmental Legislation, Statutory requirements and McNab’s Policies
and Procedures sect out in the Environmental Management System and will comply with any
reasonable environmental instruction.
I acknowledge receipt of and understand my responsibilities and agree to ensure an environmentally
responsible workplace is achieved and maintained.
Name (Block Letters) Signature Date
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 13 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.