Council archive · source document
Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239
Plans and drawings: the text below has words only, no drawings.
mcnab construction
07-DOC-003 Rev 4
4.7 Subcontractors and Suppliers
All subcontractors and suppliers shall be responsible for ensuring all activities and materials comply
with the contract and Project Environmental Requirements.
4.8 Delegation of Authority
Any delegation of authorised and responsibilities contained in this EMP shall be in writing with
notification provided to the Environmental Representative upon request.
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 14 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.