Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239
Plans and drawings: the text below has words only, no drawings.
mcnab construction
07-DOC-003 Rev 4
5 Implementation
5.1 Overview
A site inspection of Infinity Apartments – Gympie Tce Noosaville identified environmental risks as
outlined below:
• Erosion and sediment releases from site
• Potential to introduce or spread weeds
• Generation of noise
• The generation of construction, general or other waste
• Inappropriate storage and handling of machinery and hazardous materials
5.2 Environmental Site Procedures
Construction can have the potential to disturb flora and fauna, generate nuisance air and noise
emissions and generate general and hazardous waste. McNab will ensure the below Environmental
Procedures are followed to ensure the risk is minimised or eliminated.
• Site Establishment / Prestart Environmental Briefing
• Community Consultation
• Site Management
• Erosion and Sediment Control
• Flora Protection
• Fauna Protection
• Noise and Vibrations
• Air Emissions
• Waste Minimisation and Management
• Concreting
• Storage of Hazardous Substances
• Contaminated Land
• Acid Sulphate Soils
• Water Quality
• Fire Ants (if applicable)
• Interaction with local community
• Heritage protection
The detailed environmental site procedures for each of the above mentioned sections can be found
within the Appendix 1.
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 15 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.