mcnab construction
07-DOC-003 Rev 4
Performance Indicators
No complaints received
10.3 Site Manager
Objective
• Minimisation of environmental risks from construction activities
• Compliance with the obligations of the Act
Management Strategy
• Undertake site management in accordance with environmental best practice and this
EMP
• Ensure all erosion and sediment control devices are checked on a weekly basis and after
inclement weather to ensure they are working effectively
• Regularly remove build-up from sediment fence
• Ensure all existing stormwater drains, overland flow paths and stormwater devices
unaffected by the works are fully operational and maintained against erosion. Ensure no
damage or obstruction by machinery or works
• Maintain the construction exit and vibration grids reasonably free of sediment to ensure
the controls are functioning correctly
• Regularly visually inspect water exiting the site (for visual sediments or pollutants)
• Regularly inspect chemical containers for leaks and/or damage, and the work site for
spills/leakages
• Site Foreman to undertake regular inspections
Action / Corrective Action
• Site Foreman to regularly monitor site in accordance with the above Management
Strategy
• Corrective measures are to be agreed to in conjunction with the HSE team
Performance Indicators
• No chemical spills
• No complaints or notices
• Stormwater drains remain effective during and after Construction works.
10.4 Erosion and sediment control
Objective
• Compliance with the Environmental Protection (Water) Policy 2009
• Compliance with the Environmental Protection (Air) Policy 2008
• Have no significant impact on existing water quality in nearby waterways during
construction activities
• Minimisation of potential erosion risks and transportation of sediment off site
• Minimisation of the dust generation from construction activities and machinery; no
visible dust plumes
Management Strategy
• As per Erosion and Sediment Control Plan attached
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 25 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.