                                                                              mcnab construction
                                                                               07-DOC-003 Rev 4
Performance Indicators
No complaints received

10.3           Site Manager
Objective
   •      Minimisation of environmental risks from construction activities
   •      Compliance with the obligations of the Act

Management Strategy
  •     Undertake site management in accordance with environmental best practice and this
        EMP
  •     Ensure all erosion and sediment control devices are checked on a weekly basis and after
        inclement weather to ensure they are working effectively
  •     Regularly remove build-up from sediment fence
  •     Ensure all existing stormwater drains, overland flow paths and stormwater devices
        unaffected by the works are fully operational and maintained against erosion. Ensure no
        damage or obstruction by machinery or works
  •     Maintain the construction exit and vibration grids reasonably free of sediment to ensure
        the controls are functioning correctly
  •     Regularly visually inspect water exiting the site (for visual sediments or pollutants)
  •     Regularly inspect chemical containers for leaks and/or damage, and the work site for
        spills/leakages
  •     Site Foreman to undertake regular inspections

Action / Corrective Action
   •      Site Foreman to regularly monitor site in accordance with the above Management
          Strategy
   •      Corrective measures are to be agreed to in conjunction with the HSE team

Performance Indicators
   •     No chemical spills
   •     No complaints or notices
   •     Stormwater drains remain effective during and after Construction works.

10.4           Erosion and sediment control
Objective
   •      Compliance with the Environmental Protection (Water) Policy 2009
   •      Compliance with the Environmental Protection (Air) Policy 2008
   •      Have no significant impact on existing water quality in nearby waterways during
          construction activities
   •      Minimisation of potential erosion risks and transportation of sediment off site
   •      Minimisation of the dust generation from construction activities and machinery; no
          visible dust plumes

Management Strategy
  •     As per Erosion and Sediment Control Plan attached



Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                Page 25 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.