                                                                                    mcnab construction
                                                                                     07-DOC-003 Rev 4
Action / Corrective Action
   •      As per Erosion and Sediment Control Plan attached

Performance Indicators
   •     No environmental breeches (run off/ erosion)
   •     No Complaints
   •     Environmental Inspection records

10.5            Protection of Flora
Objective
   •      Minimise disturbance to native flora during site establishment and construction

Management Strategy
  •     Clearly mark any vegetation that is identified for removal. Clearly communicate the
        meaning of this marking to all staff
  •     Where required, establish vegetation exclusion zones, subject to the pre-works
        inspection. These should extend to cover the area below the tree dripline. Where this is
        not possible, mulch shall be placed under the tree to protect roots from damage caused
        by vehicle compaction. Measures to assist in the protection of vegetation could include:
               Flagging of vegetation
               Signage
               Barrier Fencing
               Trunk guards
               Temporary tying back of branches for access
  •     All non-native vegetation shall be removed
  •     Ensure that soils and fill material used in landscaping are free from weeds and their
        seeds
  •     Retaining vegetation until just prior to excavation activities will assist in soil stability and
        reduction of erosion during works

Action / Corrective Action
   •      Follow all above Management Strategies for the protection of flora
   •      Corrective measures are to be agreed to in conjunction with the HSE team
   •      If vegetation to be protected is damaged or destroyed, the project manager shall notify
          the Project team as soon as practicable
   •      Performance Indicators:
                   No damage to protected flora
                   Successful removal of all declared and environmental weeds




Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                      Page 26 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.