mcnab construction
07-DOC-003 Rev 4
Action / Corrective Action
• As per Erosion and Sediment Control Plan attached
Performance Indicators
• No environmental breeches (run off/ erosion)
• No Complaints
• Environmental Inspection records
10.5 Protection of Flora
Objective
• Minimise disturbance to native flora during site establishment and construction
Management Strategy
• Clearly mark any vegetation that is identified for removal. Clearly communicate the
meaning of this marking to all staff
• Where required, establish vegetation exclusion zones, subject to the pre-works
inspection. These should extend to cover the area below the tree dripline. Where this is
not possible, mulch shall be placed under the tree to protect roots from damage caused
by vehicle compaction. Measures to assist in the protection of vegetation could include:
Flagging of vegetation
Signage
Barrier Fencing
Trunk guards
Temporary tying back of branches for access
• All non-native vegetation shall be removed
• Ensure that soils and fill material used in landscaping are free from weeds and their
seeds
• Retaining vegetation until just prior to excavation activities will assist in soil stability and
reduction of erosion during works
Action / Corrective Action
• Follow all above Management Strategies for the protection of flora
• Corrective measures are to be agreed to in conjunction with the HSE team
• If vegetation to be protected is damaged or destroyed, the project manager shall notify
the Project team as soon as practicable
• Performance Indicators:
No damage to protected flora
Successful removal of all declared and environmental weeds
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 26 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.