mcnab construction
07-DOC-003 Rev 4
10.6 Protection Fauna
Objective
• Minimise disturbance to native fauna during site establishment and construction
Management Strategy
• It is an offence under the Nature Conservation Regulations 2017, to damage or interfere
with a nest or hollow used by a protected animal. It is therefore necessary to remove (or
reasonably persuade to vacate) all fauna to avoid causing injury or death
• Surveillance for fauna should be undertaken in any areas to be disturbed prior to and
during any construction activities on a daily basis. Appropriately trained personnel only
shall undertake the removal of native fauna
• If fauna or nests are discovered during the works, works affecting the fauna are to be
stopped and the HSE team contacted for further instruction
Action / Corrective Action
• Conduct a pre start inspection of site to identify fauna and conduct regular inspections
• If an animal is injured, contact EPA Hotline for the nearest wildlife carer
• Cease vegetation clearing immediately
• Discuss options in conjunction with the HSE team
Performance Indicators
• No disturbance to native fauna on site
10.7 Noise and vibration
Objective
• No noise complaints from nearby residents
• Compliance with the Environmental Protection (Noise) Policy 2008
Management Strategy
• Undertake notification of nearby residents so they are fully informed of the works and
measures being taken to minimise noise, prior to the commencement of works
• Undertake noise mitigation measures including:
Fitting construction equipment with silencers/ mufflers wherever possible
Ensure plant is well maintained
Ensure all machinery used on site is in correct working order
Wherever possible use smaller equipment that is likely to create less noise
• Works should take place between the designated hours as per the Development
Approval
Action / Corrective Action
• Corrective measures are to be agreed to in conjunction with the HSE team
• In the event that complaints are received, daily monitoring of noise should be
undertaken and further mitigation measures will be implemented
Performance Indicators
• No community complaints of noise from site
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 27 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.