Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                 mcnab construction
                                                                                  07-DOC-003 Rev 4

10.8           Air emissions
Objective
   •      Minimal dust generation from construction activities and machinery
   •      No complaints from local residents
   •      Compliance with the Environmental Protection (Air) Policy 2008

Management Strategy
  •     Shade cloth to be fixed to the temporary site fence on site in residential / impact areas
  •     Minimise dust emissions by wetting exposed soil surfaces, working areas likely to
        generate dust and trafficable areas
  •     Implement “wetting” systems on the project site, such as wet fogging machines, water
        mist sprays along boundaries and localised wetting, suited to controlling dust from
        operational activities
  •     Cover stockpiles of spoil or new material with material covers, mulch or equivalent
  •     Keep machinery within designated access paths and working corridors. Where
        practicable use coarse road base such as recycled concrete to form main internal traffic
        roads
  •     Arrange mechanical sweeping of any sediment on adjacent public access paths as
        required as a secondary control for sediment
  •     Ensure that all machinery is maintained and in correct running order at all times
  •     Undertake regular visual monitoring of air quality and take corrective action as
        necessary

Action / Corrective Action
   •      Corrective measures are to be agreed to in conjunction with the HSE team
   •      If an air pollution plume is noted, damping of the source should be undertaken
   •      Due to current drought conditions, limit the use of water, particularly the use of
          reticulated water supplies. Water use should be minimised where possible

Performance Indicators
   •     No complaints from local residents
   •     Environmental Inspection records

10.9           Waste Management (excluding soil)
Objective
   •      Avoid or minimise contamination of land caused by use of imported materials, or by
          spillage of fuels, paint, form oil etc.
   •      Minimisation of waste generation
   •      Maximisation of waste reuse and recycling
   •      Disposal of wastes from construction activities at appropriate locations
   •      Compliance with the Environmental Protection (Waste Management) Regulation 2000




Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                   Page 28 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.