mcnab construction
07-DOC-003 Rev 4
10.8 Air emissions
Objective
• Minimal dust generation from construction activities and machinery
• No complaints from local residents
• Compliance with the Environmental Protection (Air) Policy 2008
Management Strategy
• Shade cloth to be fixed to the temporary site fence on site in residential / impact areas
• Minimise dust emissions by wetting exposed soil surfaces, working areas likely to
generate dust and trafficable areas
• Implement “wetting” systems on the project site, such as wet fogging machines, water
mist sprays along boundaries and localised wetting, suited to controlling dust from
operational activities
• Cover stockpiles of spoil or new material with material covers, mulch or equivalent
• Keep machinery within designated access paths and working corridors. Where
practicable use coarse road base such as recycled concrete to form main internal traffic
roads
• Arrange mechanical sweeping of any sediment on adjacent public access paths as
required as a secondary control for sediment
• Ensure that all machinery is maintained and in correct running order at all times
• Undertake regular visual monitoring of air quality and take corrective action as
necessary
Action / Corrective Action
• Corrective measures are to be agreed to in conjunction with the HSE team
• If an air pollution plume is noted, damping of the source should be undertaken
• Due to current drought conditions, limit the use of water, particularly the use of
reticulated water supplies. Water use should be minimised where possible
Performance Indicators
• No complaints from local residents
• Environmental Inspection records
10.9 Waste Management (excluding soil)
Objective
• Avoid or minimise contamination of land caused by use of imported materials, or by
spillage of fuels, paint, form oil etc.
• Minimisation of waste generation
• Maximisation of waste reuse and recycling
• Disposal of wastes from construction activities at appropriate locations
• Compliance with the Environmental Protection (Waste Management) Regulation 2000
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 28 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.