                                                                                  mcnab construction
                                                                                   07-DOC-003 Rev 4


Management Strategy
  •     Any waste materials found or generated on site that are contaminated or toxic must be
        transported off site by a licensed waste contractor and treated in accordance with best
        practice guidelines. Receipts of this removal must be kept
  •     In order to avoid waste, only purchase the required quantities of materials. Where
        possible, remove packaging at purchasing location or return to manufacturer on removal
  •     Provide waste storage containers for materials to be reused or recycled. Ensure all
        personnel use the correct containers
  •     Do not place waste materials or building materials where others are exposed to slips,
        trips or falls. All materials must be stored within the site boundaries
  •     Waste for paper, plastics, cardboards, food scraps, used food containers etc will be
        placed into appropriate waste storage containers
  •     Concrete to be removed from site should be disposed of at a concrete recycling plant
  •     Ensure all construction and general waste is removed to applicable landfill centre

Action / Corrective Action
   •      Corrective action is to be agreed to in conjunction with the HSE team

Performance Indicators
   •     Notifications of spillages

10.10          Concreting
Objective
   •      Compliance with the Environmental Protection (Water) Policy 2009
   •      No visual evidence of polluted water entering the waterway or any stormwater system

Management Strategy
  •     Establish an area where wash-water from concreting or other activities can be collected
        and will not enter waterways, stormwater drains, footpaths or roads
  •     Consider recycling any concrete wastes through the Council works depot
  •     All concrete washing shall occur in the bunded concrete washout area that has been
        formed as a part of site establishment activities
  •     Any concrete waste should be recycled where possible

Action / Corrective Action
   •      Corrective action is to be agreed to in conjunction with the HSE team

Performance Indicators
   •     Reduce waste on site through efficient ordering
   •     Recycling of concrete where possible

10.11          On Site Hazardous / Dangerous Goods Management
Objective
   •      Correct storage handling and usage of all on site Hazardous Materials and Dangerous
          Goods



Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                   Page 29 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.