Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239
Plans and drawings: the text below has words only, no drawings.
mcnab construction
07-DOC-003 Rev 4
Management Strategy
• All hazardous materials and dangerous goods will be stored with sufficient bunding to
control any potential leaks
• Leaking vehicles or containers (fuel, chemical) will not be allowed on site. If a vehicle or
container is found to leak, the immediate affected area must be controlled, e.g. with a
container or tray that is capable of containing 110% of the potential spill volume of
liquids to control the leak. Sufficient absorbing materials and appropriate tolls to soak
up any accidental spillage or leak will be held on site as an emergency spill kit
• Temporary barricading will be constructed around the bunded area to prevent
machinery or other damage to bund during all stages of the project
• Minimise the quantity of Hazardous chemicals and Dangerous Goods stored on site.
Permitted quantities shall be below the definition of a Dangerous Goods location as in
accordance with the applicable Acts and Regulations
• Site hazardous and non-hazardous Chemicals will be kept to a practical minimum. Safety
Data Sheets (SDSs) will be kept in the site office or accessible via McNab internal
intranet and or Procore
• Controls shall be implemented so that emissions of smoke, substances, dust or fumes
into the atmosphere from the site (including plant) is minimised as best as practicable
• Fuel storage arrangements and the list of chemicals stored on site will be identified in
the Hazardous Chemicals Register located in the site office or on Procore
• McNab and subcontractors must obtain necessary approvals required by authorities to
store fuel, oil and other liquid contaminants
• All decanting of fuels, oils and substances other than servicing and refuelling machinery
shall be conducted within a properly constructed bunded area, which will prevent
migration to groundwater and potential spills or leaks. Oil shall be transported in
original closed containers
• Accidental spillage of liquids (chemical, fuel etc) shall be reported to the appropriate
McNab personnel, who will initiate immediate clean up procedures. For minor spillages,
the affected soil shall be removed for disposal in an authorised location
• Vehicles shall not be washed or maintained in areas where contaminants can be
released into any waterway or stormwater system
• All refuelling, storage or maintenance shall be contained to designated areas away from
drainage paths
• Good housekeeping is required at all times. Waste will be disposed in strategically
placed bins which will be emptied on a regular basis and the waste disposed of at an
appropriate waste management facility
Action / Corrective Action
• Refer to the Emergency Response Procedure
• Enforce relevant clean up procedures
Performance Indicators
• Notifications of spillages
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 30 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.