Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                mcnab construction
                                                                                 07-DOC-003 Rev 4

10.12          Site decommissioning
Objective
   •      Site is clean and all materials are removed following completion of site works

Management Strategy
  •     Ensure removal of all temporary protective measures
  •     Ensure controls are removed carefully, so as not to cause damage or sedimentation
  •     All construction waste must be removed from the site

Action / Corrective Action
   •      Project Management team shall ensure that the above management strategies are
          followed

Performance Indicators
   •     No harm or damage to native fauna and flora
   •     A clean and tidy construction site is handed over to client

Reporting
   •      In the event that decommissioning of site is not deemed to be in accordance with the
          above, please contact the Project Manager for rectification

10.13          Site rehabilitation upon Practical Completion
Objective
   •      All declared weeds are removed from the site
   •      The site is revegetated in accordance with approved landscape plans
   •      The site is well stabilised

Management Strategy
  •     Disturbed areas must be stabilised by revegetation and turf as per approved landscape
        plans
  •     The site must be restored to a condition equivalent to or better than the pre-
        constructed condition
  •     Rehabilitation of the site should be undertaken as soon as possible after works have
        been completed

Action / Corrective Action
   •      Project Manager shall ensure that the above management strategies are followed

Performance Indicators
   •     The landscaping has been completed in accordance with the project plans and
         specifications




Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                  Page 31 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.