Performance Indicators
• No parking complaints
• No incidents involving vehicles and others on or adjacent to the site
10.16 Containment of Fire Fighting Water and Chemical Foam
Objective
• Primary aim is to eliminate the potential of a fire by:
Minimising combustible waste stockpiled on site
Invoking a Hot Work Permit system
Establishing smoking areas
Secondary – provide adequate facilities to ensure that any polluted fire-fighting
water and chemical foam is not released into waterways
Management Strategy
• Appropriate number of bins provided for combustible waste product. Bins to be
regularly emptied
• Appropriate containment of flammable goods. Safety signage displaying hazard –
FLAMMABLE GOODS NO NAKED FLAME
• Establish smoking areas outside buildings and provide bins for cigarette butts. Smoking
policy communicated during site induction
• Provision and maintenance of on-site stormwater detention storages such that they may
be used to detain fire-fighting water and chemical foam in the event of a fire
• Provision of emergency bund material to prevent overflow from site storage into
drainage swales
• Contact details of all emergency services displayed and communicated during site
induction
• Site Foreman trained in procedure should an emergency situation occur
• Hot Work Permit system to be used by workers undertaking hot works where there is
the potential for a fire – vegetation, combustible or flammable materials
Action / Corrective Action
• As directed by the emergency services or EPA officers
Performance Indicators
• No fire on site
• No over flow of fire-fighting water or chemical foam into external stormwater drainage
system
10.17 Contaminated land
Objective
• To implement measures to minimise environmental impacts resulting from disturbance
of contaminated land
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 33 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.