Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                mcnab construction
                                                                                 07-DOC-003 Rev 4



Management Strategy
  •     Signage is to be erected indicating that the works are being carried out under
        appropriate guidelines
  •     Where possible, activities are to be timed to coincide with periods of no or little flow
  •     Activities are to be completed as quickly as possible
  •     The area of disturbance must be no greater than the minimum area necessary for
        upgrading the sewer
  •     The extent and duration of bare surface exposure must be minimised and protected
        from weathering, raindrop impact and water run-off
  •     Clean water run-off must be diverted around areas of disturbance where practicable
  •     Sediment must be captured and retained on site
  •     Bed and bank stability must be managed to minimise erosion and reduce sedimentation
  •     Machinery to be used should be selected on the basis of type and size necessary to
        achieve minimal disturbance of the site. In addition, machinery is to be stored, refuelled
        and maintained outside the high banks of the creek
  •     Excavation must be undertaken in a way that does not interfere with the flow of water
        to the downstream environment and downstream users
  •     Material excavated that is not waste material must be spread evenly within the bed and
        banks of the waterway and must not interfere with the flow of the waterway
  •     Constructed drainage and discharge structures must not alter the natural bed and bank
        profile
  •     Upon completion, revegetation of disturbed areas is to occur with native vegetation
        endemic to the area and/or installation of erosion protection measures where
        appropriate

Action / Corrective Action
   •      The Project Manager shall ensure that the above management strategies are followed
   •      The Site Foreman shall monitor compliance with work activities site

Performance Indicators
   •     Reports from site audits conducted by the HSE team indicates no corrective action
         requirements
   •     The HSE team will be immediately informed of any breach of this site specific
         requirement

10.19          Fire Ants
Objective
   •      The identification and notification of Red Imported Fire Ants (RIFA) to prevent the
          spread of the Fire Ants in Queensland
   •      Prevention of the importation of RIFA into the construction zone




Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                  Page 35 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.