Construction Management Plan
Traffic will generally be managed in the following way:
Designated delivery routes will be communicated to all personal, and enforced by Site
Management Team
Strict scheduling of vehicle movement will occur to minimize off site waiting times.
On-site parking will be provided.
Vehicle movements will be compliant with Conditions of Consent and broader road-use
regulations, particularly with regard to hours of work, materials loading and unloading, and over
size deliveries and installation.
A suitable vehicle hold/staging point will not be necessary outside the site area to facilitate the coordination
as deliveries arrive and are unloaded as there are suitable areas within the site for this to occur.
4.2 Street Closures
Street closures are not anticipated during the construction works.
4.3 Pedestrian Management
The site is bound by a reasonable public footpath network. Existing pedestrian paths will be maintained as part of
the development, however some diversions may be required, as described in the draft TMP / TGS.
4.4 Site Accommodation Compound & Shedding
The site accommodation compound, site sheds and amenities will be contained completely within the site
construction zone defined by the permitter fencing.
4.5 Site Security
qldBUILT will ensure the site is locked and secured when there is not a presence on the site. Licensed security firms
may be engaged as required to provide further security coverage. Typically, this would be over holiday periods or
closer to completion of the project.
A site security camera with remote notification has already been established on the site.
4.6 Construction Zones and Material Handling
4.6.1 Construction Zones
All construction traffic will enter and exit the site either via the dedicated site access points along
Eumundi Noosa Road and Headland Drive. Appropriate traffic management and signage will be adopted
to the external of the site in both locations as per the draft TMP / TGS.
4.6.2 Material Lay Down
Materials will be delivered and unloaded completely within the site construction zone defined by the
permitter fencing.
No material handling will take place outside the construction zone or in the adjacent streets.
Document: CMP01 Construction Management Plan [Version 2.0] Scheduled Review Date: 30/10/2024
Page 10 of 18 qldBUILT Pty Ltd | Uncontrolled when printed Date Reviewed: Xx/xx/xx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.