Construction Management Plan 5.0 Risk Management 5.1 WHS Management Plan A Workplace Health & Safety Management Plan will be developed to plan and control the construction operations, and to ensure that wellbeing of all personnel, including workers and members of the public, is maintained, and that environmental considerations are taken into account. Health & Safety aspects that will be covered, in line with the principles of ISO 45001, include but are not limited to, electrical, fire, manual handling, hazardous substances and dangerous goods. Environmental aspects that will be covered, in line with the principles of ISO 14001, include but are not limited to, stormwater, noise, dust control, hazardous materials, contaminated soil and waste management. NOTE: where it is determined that subcontractors have the potential to impact negatively on the environment, they will be required to develop and submit a project-specific Environmental Management Plan of their own. For further information regarding any of the processes dealing with Health, Safety or Environment related matters, refer directly to the project specific HSE Management Plan. 5.2 Emergency Plan In the case of an emergency, qldBUILT have implemented both an Emergency Response Plan and an Emergency Contacts List. A project-specific Emergency Management Plan has been developed outlining the procedures to be followed in the event of an emergency. Evacuation Plans, with emergency contact details, will be posted in relevant locations around the site. 6.0 Adjoining & Neighbouring Owners Management 6.1 Communication Prior to commencement of works, qldBUILT Construction will notify adjacent property owners advising them of the proposed development and construction duration. It is essential that stakeholders are aware of current and future activities of the project and how these could impact them, the duration, what mitigation / contingency measures will be provided by qldBUILT. Points of contact between qldBUILT’s project team and stakeholders will be agreed for various scenarios, with stakeholders provided with 24-hour contact numbers. 6.2 Services Interruptions and Impairment Prior to any Authority Services being impaired to adjoining properties a Disruption Shutdown Application (DSA) will be made. This process will be implemented on the project to provide advance agreement for specific work activities to be carried out. DSA’s will typically be made a number of weeks in advance of proposed work and in line with the agreed project notification durations. Depending on the risk profile of the proposed work, the agreed notification durations may be required months in advance. Document: CMP01 Construction Management Plan [Version 2.0] Scheduled Review Date: 30/10/2024 Page 12 of 18 qldBUILT Pty Ltd | Uncontrolled when printed Date Reviewed: Xx/xx/xx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.