Council archive · source document
qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
(Adjacent to or across
☐ Other ☐ Clear visibility of oncoming ☐ Mandatory clearances to
existing lanes). traffic at temp crossing points travel path
☒ Present ☐ Not Present
☐ Communication protocols
Worksite machinery ☐ Temporary road / ☐ Portable traffic signals
entering into live lanes between machine operator &
lane closure ☐ Lane Closure
unexpectedly TC’s
☐ Traffic controller/s / Hold -
☐ Present ☒ Not Present Release
☐ Road closure
After hours hazards within ☐ Clear delineation of travel ☐ Speed reduction
☐ Lane closure
traffic lanes created due to path & worksite ☐ Warning signs
works conditions (i.e. ☐ Detour ☐ Portable traffic signals ☐ VMS
gravel, surface height ☐ ☐ Portable flood lighting
differences etc)
☐ Present ☒ Not Present
Poor lighting of changed ☐ Portable flood lighting ☐ Speed reduction
traffic conditions and / or ☐ Ensure delineation devices conform ☐ Warning signs
control points. to reflectivity standards ☐ VMS
☐ Present ☒ Not Present
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.