Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Potential Safety Hazards       Applicable TGS     Risk rating                                                Control Measures                                         Risk rating
                                                before controls                                                                                                      after controls

To WORK SITE /                                  L     C     R#    Eliminate / Substitute              Engineer / Isolate                    Administrative           L     C    R#
SIGNAGE
                                                                  ☐ Road closure
After hours hazards within                                                                  ☐ Clear delineation of travel        ☐ Speed reduction
traffic lanes created due to                                      ☐ Lane closure              path & worksite                    ☐ Warning signs
                                                                  ☐ Detour                  ☐ Portable traffic signals
works conditions (i.e.                                                                                                           ☐ VMS
gravel, surface height                                            ☐                         ☐ Portable flood lighting
differences etc)
                                                                                            ☐ Sweep surface after works
☐ Present     ☒ Not Present
                                                                  ☐ Lengthen work area
Poor advance sight distance                                                                 ☐ Pre-warning shadow vehicle         ☐ Extra advanced warning signs
to work site                                                      ☐                           with flashing lights               ☐ Speed reduction
                                                                                            ☐ Other                              ☐ Ensure sight distance
☐ Present     ☒ Not Present                                                                                                        requirements are met
                                                                                                                                 ☐ Other

Signage positioning causes          All         L3    C1    R1    ☒ Choose alternative                                                                               L4   C1    R3
                                                                                            ☒ Correct alignment & height         ☒ Correct sign distances
signs to be obscured                                                placement within
                                                                                            ☒ Position clear of obstructions       incorporating permitted
                                                                    allowed tolerances
☒ Present     ☐ Not Present                                                                 ☒ Position with appropriate lead       variances
                                                                                             in sight distance                   ☐ Other


Available width past work                                         ☐ Road closure
                                                                                            ☐ Traffic Controller/s               ☐ Speed Reduction
area too narrow for all                                           ☐ Lateral shift lanes
                                                                                            ☐ Portable traffic signals           ☐ Warning signs / VMS
vehicle types                                                     ☐ Detour
                                                                                            ☐ Temporarily widen lanes for wide   ☐ Road authority advised of works
☐ Present     ☒ Not Present                                                                   loads                              ☐ Road authority to advise of
                                                                                            ☐ Other                               wide loads
                                                                  ☐ Works at a different
High traffic volumes cause                                                                  ☐ Appropriate parking on             ☐ Repeater advance warning signs
unreasonably long queue                                             time / day
                                                                                              shoulder                           ☐ Speed reduction
lengths                                                           ☐ Road closure
                                                                                                                                 ☐ Reduce hold times
                                                                  ☐ Detour / alternative
☐ Present     ☒ Not Present
                                                                    route
                                                                  ☐ Side track (1 or 2
                                                                    lanes)
                                                                  ☐ Lateral shift lanes
                                                                  ☐ Works at a different
Surrounding geography /                                                                     ☐ Appropriate parking on             ☐ Repeater advance warning signs
                                                                    time / day
infrastructure does not                                                                       shoulder                           ☐ Speed reduction
allow sign placement at                                           ☐ Road closure                                                 ☐ Reduce hold times
legislated positions                                              ☐ Detour / alternative
☐ Present     ☒ Not Present                                         route
                                                                  ☐ Place signage at
                                                                    end of barrier / wall




                                                                                                                                                                                      9

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.