Council archive · source document
qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
Construction Management Plan
1.1 Precedence
Where ambiguity is detected between the procedures and requirements in this Construction Management
Plan and any other third-party Management Plans, then the procedures nominated in this plan will take
precedence.
1.2 Interface with other Project Plans & Procedures
The CMP forms part of an integrated set of Project Management Plans and should be read in conjunction
with these plans.
2.0 Proposed Site
2.1 Site Description
The site is situated along Eumundi Noosa Road Noosaville and has a single frontage, with a separate proposed
site access via Headland Drive.
Figure 1. Site and Adjoining Roads
Document: CMP01 Construction Management Plan [Version 2.0] Scheduled Review Date: 30/10/2024
Page 5 of 18 qldBUILT Pty Ltd | Uncontrolled when printed Date Reviewed: Xx/xx/xx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.