Skip to the record
Search everything, all in one place.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
 FPE Ref: 6693-240215-1.0



          6.2      GROUNDWATER MANAGEMENT STRATEGY
                            ▪   Construction Foreman to maintain a log of inspections and maintenance actions completed (including improvements).
          Reporting
                            ▪   The log is to be kept for verification of compliance on an as-needs basis.
                            ▪   Records of any water quality testing to be retained for compliance.
                            ▪   Where groundwater is encountered, appropriate capture, characterisation and treatment may be required.
          Incidents
                            ▪   If discharge of groundwater is to occur the trigger values and testing frequencies nominated below are to be adopted:
                            Trigger Values – Groundwater Expressed to Surface Drains

                                                Electrical




                                                                                              T
                                                                Total Dissolved Solids      Dissolved Aluminium                                 Sulfate (SO4) : Chloride
                                  pH          Conductivity                                                           Titratable Acidity (TA)




                                                                                    AF
                                                                         (TDS)                        (Al)                                                (Cl)
                                                   (EC)




                                                                              R
                                pH Unit            µg/L                   mg/L                        mg/L                     mg/L                      Ratio



                                                                        D
                                  >5                                          +/- 10% baseline concentrations                                            <0.5
                            ▪   Undertake a survey of groundwater control measures and determine effectiveness of current controls.
          Corrective
                            ▪   Reassess the risks of the works areas and determine if further controls will remedy any problems.
          Actions
                            ▪   Seek the assistance of an appropriately qualified professional for advice on groundwater control devices.




15 February 2024                                          Construction Environmental Management Plan                                                                       13
                                                79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.