6.2 GROUNDWATER MANAGEMENT STRATEGY
▪ Construction Foreman to maintain a log of inspections and maintenance actions completed (including improvements).
Reporting
▪ The log is to be kept for verification of compliance on an as-needs basis.
▪ Records of any water quality testing to be retained for compliance.
▪ Where groundwater is encountered, appropriate capture, characterisation and treatment may be required.
Incidents
▪ If discharge of groundwater is to occur the trigger values and testing frequencies nominated below are to be adopted:
Trigger Values – Groundwater Expressed to Surface Drains
Electrical
T
Total Dissolved Solids Dissolved Aluminium Sulfate (SO4) : Chloride
pH Conductivity Titratable Acidity (TA)
AF
(TDS) (Al) (Cl)
(EC)
R
pH Unit µg/L mg/L mg/L mg/L Ratio
D
>5 +/- 10% baseline concentrations <0.5
▪ Undertake a survey of groundwater control measures and determine effectiveness of current controls.
Corrective
▪ Reassess the risks of the works areas and determine if further controls will remedy any problems.
Actions
▪ Seek the assistance of an appropriately qualified professional for advice on groundwater control devices.
15 February 2024 Construction Environmental Management Plan 13
79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.