Background
On 20 June 1980, Council approved a shopping centre development including shops and
offices (TPL21).
On 18 March 2021, Council approved the redevelopment of the site for a new Development
Permit for Food and Drink Outlet, Office and Shops.
Unfortunately the increase in materials over the past 12 to 18 months has had a huge
impact on the cost of building and the pricing from the tenderers was between 35% and
55% above the Quantity Surveyor estimates. As a result, the owner could not make the
redevelopment viable to proceed.
Minor Change Test
An assessment against the meaning of minor change and a response about the proposed
application is provide below. The Planning Act 2016 defines a minor change as a change
to the approval that:
i. would not result in a substantially different development*;
(*In determining whether the proposed change would result in substantially
different development, the assessment manager or referral agency must
consider the individual circumstances of the development, in the context of
the change proposed.)
Schedule 1 of the Development Assessment Rules set outs provisions for a substantially
different development. A change may be considered to result in a substantially different
development if the proposed change results in any of the following outlined in Table 1
below.
Table 1 - Substantially different development
Provisions of Schedule 1 of the DA Rules Response
(a) Involves a new use There is no new use proposed onsite
(b) results in the application applying to No new parcels of land is introduced
a new parcel of land; or
(c) dramatically changes the built form in The built form generally remains
terms of scale, bulk and appearance; unchanged apart from cosmetic changes
or and upgrading accessibility. This minor
change does not dramatically change the
scale, bulk or appearance.
(d) changes the ability of the proposed There is no change proposed to the
development to operate as operation of the commercial building.
intended; or
(e) removes a component that is The development remains a commercial
integral to the operation of the building.
development; or
(f) significantly impacts on traffic flow There are no changes to the tenancy
and the transport network, such as sizes and the existing carparking is
increasing traffic to the site; or provided byway of the original
contribution and onsite parking.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Request report 2022.pdfRelated documentApplication case desk ↗
About this file
- File size
- 488 KB (small file)
- File type
No other editions are linked here.