GENERAL COMMITTEE MEETING AGENDA 18 FEBRUARY 2019
48.7. Provide 1 suitable large canopy shade tree in the centre median near the 2
visitor car spaces at the Y junction located internal to the site.
48.8. Provide details of the methods to be used during the vegetation clearing
including the use of licensed spotter/catchers, disposal of cleared vegetation,
methods to ensure retained vegetation is protected from development works, in
particular where works are proposed adjacent to root zones of vegetation
located on the road reserve with reference to current AS 4970-2009 Protection
of Trees on Development Sites.
49. The open space and setback areas are to be landscaped in accordance with
Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan
prepared by a suitably qualified Landscape Architect or Horticulturalist. Such
landscaping is to be completed prior to the premises being occupied and maintained
at all times thereafter.
ENVIRONMENTAL HEALTH
Waste Management
50. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
and Industrial Premises”. The facilities must include an external impervious area
correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties. A bin wash area is required with a cold-
water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
outlet must be designed to prevent storm water entry to the sewerage system. This
can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
0.5m²), or alternatively the waste area can be roofed, or any other design approved
by Council.
51. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
Mechanical Equipment
52. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following:
a. Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
b. Pumps
7am to 7pm: Maximum background + 5dB(A)
7pm to 10pm: Maximum background + 3dB(A)
10pm to 7am: No audible noise.
53. The certification must be submitted to Council, which certifies that operational noise
from any fixed plant and equipment complies with the requirements of this Decision
Notice
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 10 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.