GENERAL COMMITTEE MEETING AGENDA 18 FEBRUARY 2019
43. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
44. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
45. Conduits for electrical power or other services and connections proposed to be
installed within existing and proposed road reserves under existing sealed
carriageways, concrete pathways, concrete/sealed driveways or vegetation identified
for retention must be installed by boring. Trenching is not permitted, unless
specifically approved by Council.
General - Engineering
46. A suitably qualified Registered Professional Engineer must prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which must be submitted in conjunction with an application for a
Development Permit for Operational Works. To avoid conflict with underground pipes
or services, all existing and proposed services required by the development shall be
shown on the plans.
47. Any alteration of any public utility or other facilities necessitated by the development
of the land or associated construction works external to the site must be at no cost to
Council.
LANDSCAPE & ECOLOGY
Landscaping & Vegetation Clearing
48. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Planning Scheme
Policy 3 Landscaping Plants and Guidelines for Cooroy and must include in
particular:
48.1. Trees 1, 2 and 3 (Eucalyptus tereticornis) located in the road reserve and
identified in the Arboricultural Impact Assessment Report by Consult Arborist
Pty Ltd dated 16.01.2019 must be retained. A further arborist report based on
the approved plans must be submitted for approval which details the methods
for the retention of the trees.
48.2. The further arborist report must assess the capacity to retain vegetation
situated within the existing property boundary at the corner of Kauri and Olivine
Streets.
48.3. Provide landscaping plans using local native species that provide detailed
sections and plan of a landscaped buffer to the building setback adjacent to
Kauri and Olivine Street respectively to buffer the adjacent residential uses from
the development.
48.4. Provide 100L NATSPEC street trees every 8m of road frontage, positioned in a
manner that supports adequate sightlines and maintains existing trees identified
for retention in this permit.
48.5. Provide details of internal landscaping to the development, including provision
of suitable growing media and area to sustain landscaping, which will provide
shading and soften the visual appearance of the development.
48.6. Provide landscaping to each dwelling frontages and internal driveway networks
to provide shade and visual amenity.
Page 9 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.