Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2019-02-18 General Committee Agenda

of 61

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                              18 FEBRUARY 2019


         ENGINEERING
         Site Access and Driveway
   14.   Vehicular access driveways to serve the development shall be constructed from the
         Kauri Street and Olivine Street frontages of the site generally in accordance with the
         final approved layout plans and as amended by the conditions of this permit and in
         compliance with the applicable engineering standards and drawings.
   15.   Sealed access driveways must be provided from Kauri Street and Olivine Street
         frontages of the site to all parking and manoeuvring areas of the development
         generally in accordance with the final approved layout plans as amended by the
         conditions of this permit. The works must be undertaken in accordance with an
         Operational Works approval and must include in particular:
         15.1. Driveway crossovers generally in accordance with IPWEAQ standard drawings
               R-049 and R-050, and to grades that prevent vehicles from scraping and/or
               bottoming whilst also allowing for compliant grades and levels that match any
               existing or proposed pathway and grassed verge without posing trip or safety
               hazards to the public.
         15.2. For pedestrian safety on the footpath and vehicles exiting the site, the driveway
               and any associated fencing or vegetation near the driveway must comply with
               the minimum sight line requirements as defined in AS/NZ 2890.1, section 3.2.4.
         15.3. The proposed driveway must have a maximum width of 6m at kerb line.
         15.4. Driveway must have clearance of 1.0m from a power pole and 0.5m from and
               any service pit or manhole (eg telecommunication pit, water metre) unless a
               written approval obtained from the relevant provider.
   16.   All vehicles must enter and leave the site in a forward direction.
         Car Parking
   17.   Car parking must be provided within the site generally as shown on the final
         approved layout plans. The works must be undertaken in accordance with an
         Operational Works approval and must be in compliance with the provisions AS/NZS
         2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site
         in a forward gear and with a minimum head clearance (headroom) at any point of
         2.2m.
   18.   The internal dimensions and doorway openings of all enclosed garages must be
         designed and constructed to comply with the provisions of section 5.4 of AS/NZS
         2890.1. The applicant must demonstrate compliance by illustrating these dimensions
         on the plans submitted for both Operational Works approval and Building Works
         approval.
   19.   All visitor carpark spaces must be clearly defined by line marking each space with the
         words “Visitor Parking Only” and by sign posting each space with similar wording.
   20.   All car parking areas and access driveways must be maintained exclusively for
         vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
         Roadworks Widening
   21.   The full length of the Kauri Street and Olivine Street frontages of the development
         site must be upgraded by providing kerb & channel, bitumen road widening,
         stormwater structures and landscaping improvements to the footpath in accordance
         with an Operational Works approval. The works must include but are not limited to
         the following:




                                                                                   Page 5 of 61
Log in to download the original file

2019-02-18 General Committee Agenda(PDF, 12MB).pdf · 13.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.