GENERAL COMMITTEE MEETING AGENDA 18 FEBRUARY 2019
21.1. In regard to the Kauri Street frontage, the new kerb and channel must be
aligned so that it is offset 8 metres from the existing kerb and channel on the
western side of Kauri Street measured from the nominal face of the kerb. The
new kerb and channel must be extended to the north, approximately, to the
prolongation of the common boundary of No 21 and 19A Kauri Street and join
smoothly with the existing kerb and channel.
21.2. In regard to the Olivine Street frontage the new kerb and channel must be
aligned at about 12m offset from and parallel to the property boundary and
must extend for the full frontage of the subject site. The works shall include
suitable tapers extending beyond the frontage of the subject site to smoothly
join to the existing pavement.
21.3. The works (Kauri Street, Olivine Street and the intersection) must include
suitable drainage structures and stormwater collection to ensure that runoff
from the road formation is collected, controlled and directed to ensure that the
roadway is safely trafficable and must be in compliance with the relevant
sections of the Queensland Urban Drainage Manual (QUDM).
21.4. As part of the application for operational works, the developer’s civil
engineering consultant shall investigate and report on the possible deficiencies
in the existing stormwater system, to the western end of Agate Street and
including inspection by closed circuit television (CCTV) of the existing
stormwater system. The developer is required to rectify any deficient
stormwater pipes or structures extending from the development frontage down
to and including the manhole downstream of the 600x1200 box culvert which
crosses Kauri Street.
21.5. The design and construction of all works shall be carried out in accordance with
Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
Roads, Drainage and Earthworks and the applicable engineering standards
current at the time of construction.
The above condition is imposed pursuant to s145 of the Planning Act 2016
being non-trunk infrastructure.
22. All associated and ancillary work including pavement correction to the existing
pavement, drainage works, modification of the footpath, and adjustments to the
existing infrastructure must be undertaken to complete the roadworks widening and
must be carried out in accordance with the applicable engineering standards and the
tree retention requirements of this approval.
In this regard a schedule of works, specifications and plans detailing this work shall
be prepared and submitted to Council for approval prior to obtaining a Development
Permit for Operational Works
23. The applicant must truncate the boundaries at the intersection of Kauri Street and
Olivine Street and dedicate the truncated section as “Road”. The truncation must be
in accordance with Council’s Planning Scheme Policy PSP 5 – Engineering Design
Standards- Roads, Drainage and Earthworks part 3.13 (g). The dedication must be
undertaken at no cost to Council.
Pathway and Frontage Works
24. A new 2.0m wide concrete path must be constructed along the Kauri Street and
Olivine Street frontages of the site in accordance with an Operational Works approval
and to a desirable and smooth alignment for the comfort of users and protection of
trees identified in this permit for retention. The new path must be in compliance with
IPWEAQ standard drawing SEQ R-065 Concrete Pathway Construction Details.
Page 6 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.