2019-02-18 General Committee Agenda

of 61

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                           18 FEBRUARY 2019


         The works must include a sufficient number of pram ramps to be provided near the
         intersection of Kauri Street and Olivine Street where identified by Council to connect
         to existing and proposed pathways network.
         The above condition is imposed pursuant to s145 of the Planning Act 2016 being
         non-trunk infrastructure.
   25.   All paths, pram ramps, driveways and parking areas shall be designed and
         constructed to ensure pedestrian safety using non-slip materials, to produce an
         evenly graded surface finish, and to be in accordance with the Disability
         Discrimination Act 1992 and Australian Standard 1428.1 Design for Access &
         Mobility.
   26.   Footpath improvements such as topsoiling, grassing, tree retention and tree planting
         are required to the Kauri Street and Olivine Street frontages of the site in accordance
         with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines and in
         compliance with Operational Works approval.
   27.   The new path and frontage works must generally match the existing adjoining
         surfaces without causing a trip hazard and extend beyond the frontage where
         necessary to join and taper smoothly with any existing adjoining path and surfaces.
         Stormwater Drainage
   28.   The site must be provided with a stormwater drainage system connecting to a lawful
         point of discharge. The works must be undertaken in accordance with an Operational
         Works approval and the Queensland Urban Drainage Manual (QUDM) and the
         design be prepared and certified by a Registered Professional Civil Engineer, and
         must include/address in particular the following:
         28.1. Collection and discharge of stormwater to Council’s existing drainage system in
               Kauri Street generally in accordance with Drawing No 2018068-P01 dated
               12/09/2018 by 360 Civil Consulting and including the provision of any required
               inter-allotment drainage within the site.
         28.2. Must be no net increase in stormwater runoff from the current undeveloped
               condition of the site.
         28.3. Where applicable, extension of the site stormwater system to accommodate
               stormwater from external adjoining properties, including registration of drainage
               easements.
         28.4. The use of gravity stormwater drainage and not surcharge pits.
   29.   A CCTV inspection must be carried out by a Council approved CCTV contractor upon
         satisfactory completion of construction works. The developer will be responsible for
         the full cost of CCTV inspection, including any additional inspection necessary
         following defect identification and rectification.
         Easements
   30.   Unless otherwise agreed in writing by the relevant service provider, any public or third
         party infrastructure located on the subject site must be placed within an easement
         registered against the title of the property.
   31.   All easements must be designed in accordance with the planning scheme and
         granted at no cost to the Grantee. Where the Grantee is Council or a service
         authority, the easement documentation must be in accordance with the Grantee’s
         standard easement terms. Draft easement documentation must be submitted to
         Council for endorsement.
   32.   All works must be kept clear of any existing or proposed easements on the subject
         land, unless agreed otherwise in writing by the Grantee.


                                                                                   Page 7 of 61
Log in to download the original file

2019-02-18 General Committee Agenda(PDF, 12MB).pdf · 13.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.