Council archive · source document
Attachment 2A - Emergency Management Plan Noosa - Final · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
FM – 6.3.5 Emergency Management Plan template Operation of Basement Stormwater Pumps There are 4 storm water pumps located underneath the Central Facilities car park. The control box is located on the wall in the Car Park. There is a padlock which can be opened with the GMK key. There are also 2 pumps located underground next to the Front Lagoon. The control box for these is located directly above them. The control boxes will indicate any High-level alarms and whether any of the pumps have gone into fault. As standard practise, the pumps must be checked during each stage of the emergency response plan. The pump controls are normally set to automatic operation; however they can be switched over to manual operation if required. The maintenance company that look after the pumps is The Pump House – Contact 1300 555 555 (Pager Number 26350) Document Title: Issue: 6 Next review date: FM – 6.3.5 Emergency Management Plan Review date: February 2026 June 2026 Noosa Resort Document Owner: Authorised by: Page: 54 of 77 Health Safety & Wellbeing Manager HSW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2A - Emergency Management Plan Noosa - Final.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.