Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

NOOSA AQUATICS CENTRE UPGRADE PLAN AND NOOSA AQUATICS FACILITIES STRATEGIC PLAN · Report

of 8
GENERAL COMMITTEE MEETING                                                           6 OCTOBER 2026


2) Demand, utilisation and trends

   •   NAC utilisation is high at peak periods, constraining flexible programming and community
       access. Broader trends show strong demand for flexible lane space, aqua fitness and
       learn-to-swim year-round.

   •   Demographic change (ageing population; rising prevalence of disability and limited mobility)
       points to increased demand for wellness and rehabilitation, and for universal design across
       all upgrades, inclusive of potential warm-water therapy.

3) NAC Upgrade Plan highlights (built form & operations)

   •   Critical works: Renew NAC pool filtration systems (with provision for pool cooling).

   •   Accessibility & amenities: After design finalisation, deliver compliant, gender-inclusive, family
       and PWD amenities, undertake site-wide equitable-access upgrades inclusive of a new 25M
       amenities block.

   •   Shade, seating, safety: Expand shade across pool decks; provide covered spectator
       seating/grandstand for the 50m pool, establish a new lifeguard office with enhanced
       sightlines.

   •   Program & wellness capacity: Enlarge gym with 24-hour access; add program rooms and a
       wellness hub; upgrade water play elements; increase storage for clubs and lifeguards.

   •   Site circulation & access: Reconfigure car park (including PWD bays, bus set-down,
       after-hours access to a gym/MP room offering), provide secure bike storage (Bikeep-style),
       improve wayfinding, and coordinate with active transport strategies.

   •   Sustainability: Pursue solar PV replacements/expansions (including potential shaded solar
       canopies over parking) and consider batteries once loads are verified; landscape with
       endemic species.

   •   Future options: Investigate a movable bulkhead for the 50m pool to increase flexibility for
       squads, water polo and community use, with a feasibility study as a final project to look at a
       warm-water pool for rehab/allied health.

4) Governance, partnerships and data

   •   Adopt a consistent network data framework (utilisation, customer satisfaction, financial and
       environmental metrics) and five-year strategy review cycle.

   •   Continue tripartite MOUs with DoE/lessees; refine Council operational and financial support
       settings to sustain community access, align programming across NAC and school pools to
       relieve peak pressure.

Log in to download the original (Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.