Original source · versioned page text
NOOSA AQUATICS CENTRE UPGRADE PLAN AND NOOSA AQUATICS FACILITIES STRATEGIC PLAN · Report
GENERAL COMMITTEE MEETING 6 OCTOBER 2026 Link to Corporate Plan Theme No. 2 - Liveability Objective 2.7 - Fund and deliver sustainable assets and facilities and associated services responding to the changing needs of the community and the challenges and opportunities of the future. Theme No.4 – Future Objective 4.6 - Prepare and plan for the Olympics and Paralympics 2032 to leverage the opportunities for our community leading up to 2032 and ensuring there is a legacy benefit beyond Theme No.5 - Excellence Objective 5.1 - Improve the customer experience to prioritise customers’ needs and outcomes throughout the entire customer journey Objective 5.9 - Ensure that all residents located throughout the Shire, both hinterland and coastal areas, have equitable access to the provision of quality assets, facilities and services. Previous Council Consideration NIL Finance The staged delivery approach outlined in the Upgrade Plan enables investment to be prioritised over time, aligned with external funding opportunities and integrated into future budget and capital works planning. The Noosa Aquatic Centre continues to perform strongly, achieving controllable cost recovery breakeven outcomes over the past two financial years, with the proposed upgrades intended to support its long-term sustainability, functionality and resilience. Importantly, endorsement of the Noosa Aquatic Facilities Strategic Plan and Noosa Aquatic Centre Upgrade Plan does not commit Council to funding future capital works. Individual projects will be progressively scoped, assessed and considered through future Annual Budget, Capital Works Program and Long-Term Financial Planning processes, with delivery subject to feasibility assessments, detailed design, approvals, funding availability and separate Council consideration. The Needs Assessment and Strategic Plan identified that DoE community pools continue to play an important role in providing local aquatic access and that existing support arrangements may require review to reflect contemporary operating conditions. As part of implementing the Strategic Plan, Council will continue to review these arrangements, with additional operational funding to be considered through future budget processes. A preliminary strategic level cost benefit assessment (CBA) undertaken during preparation of the Strategic Plan identified positive economic and social returns associated with increased participation, improved accessibility, enhanced community health and wellbeing outcomes, and the long-term renewal of aquatic infrastructure. While the direct financial returns to Council do not offset the full cost of the proposed upgrades, the analysis indicates that the broader community benefits are substantial and that project viability improves significantly where external funding contributions can be secured. Overall, the findings support the strategic value of investing in aquatic infrastructure as a means of delivering long-term community, economic and wellbeing outcomes. While the CBA provides a strategic assessment of the proposed upgrades, it does not replace project-specific feasibility and financial analysis. As projects progress, further planning, design and costing work will be undertaken to inform future investment decisions. The CBA will also support future grant and funding applications, with Council continuing to pursue external funding and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.