Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published) · MCU23/0007
Stormwater Drainage
35. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval, be
generally in accordance with RECOR’s Stormwater Management Plan (P0478-26-001, Rev. 1)
dated 24 June 2026 and RECOR’s Technical Memorandum (P0478-26-01) dated 12 August
2026, and must include in particular:
a. details of a stormwater quality device that satisfies the load reduction targets specified in
Planning Scheme Policy 6 Engineering Design Standards; and
b. additional modelling demonstrating that the peak mitigated flows during the 10% AEP event
will not exceed the pre-development flows.
Stormwater Quality Management
36. A stormwater quality treatment system must be provided for the development. The device must
be SQIDEP verified and be maintained in accordance with the User Manual for the lifespan of the
development.
Services
37. Underground reticulated electricity and telecommunication services must be provided to each lot
in accordance with the standards and requirements of the relevant service provider.
38. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate the
future connection of optic fibre technology telecommunications.
39. Certification must be submitted to Council from all relevant service providers (Energex, NBN and
Unitywater) which certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Easements
40. An easement for drainage purposes must be registered in favour of proposed Lot 1 against the
title of all lots (nominally proposed Lot 2) which convey stormwater from proposed Lot 1 through
proposed Lot 2 to a Lawful Point of Discharge in Myall Street. The easement must be a minimum
width of 1.5 metres located centrally over the proposed drainage structures or of sufficient width
to wholly encompass the drainage structures. The easement must be granted prior to the
commencement of any works associated with this approval.
41. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered against
the title of the property.
42. All easements must be designed in accordance with the planning scheme and granted at no cost
to the Grantee. Where the Grantee is Council or a service authority, the easement documentation
must be in accordance with the Grantee’s standard easement terms. Draft easement
documentation must be submitted to Council for endorsement.
43. All works must be kept clear of any existing or proposed easements on the subject land, unless
agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
44. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, be generally in accordance with RECOR’s Bulk Earthworks Layout Plan (C020, Rev.
D) dated 18 September 2026 and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Page 7 of 22
Document Set ID: 25255015
Version: 5, Version Date: 22/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.