          45.     All retaining walls must be designed and constructed in accordance with the planning scheme
                  and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are
                  publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety
                  fence.
                  Damage to Services and Assets
          46.     Any damage caused to existing services and assets as a result of the development works must
                  be repaired at no cost to the asset owner at the following times:
                  a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
                  b.      where otherwise, upon completion of the works associated with the development.
                  Any repair work which proposes to alter the alignment or level of existing services and assets
                  must first be referred to the relevant service authority for approval.
                  Roofwater Harvesting
          47.     Operating roofwater harvesting and detention tanks must be provided for the development. The
                  tanks must be provided in accordance with an approval for Building Works and must include in
                  particular:
                  a.      the details identified in section 3.0 and 4.2.1.1 of RECOR’s Stormwater Management Plan
                          (P0478-26-001, Rev. 1) dated 24 June 2026;
                  b.      a total tank capacity of 50 kilolitres for reuse and 50 kilolitres for detention;
                  c.      a catchment of 100% of the building roof area;
                  d.      re-use of harvested stormwater for internal non-potable uses and outdoor uses; and
                  e.      The roofwater drainage system flowing to the tanks is to be designed to cater for the 1%AEP
                          event including a 20% increase in rainfall intensity due to climate change.




                                                                                                     Page 8 of 22
Document Set ID: 25255015
Version: 5, Version Date: 22/10/2026

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published).pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.