SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published] · 132003.221132.7
Plans and drawings: the text below has words only, no drawings.
2003/221132
Water
100. The water supply network shall be generally in accordance with the approved ‘Water Supply
Master Plan’ - Drawing 01691-140C by Eraland Consulting.
101. An application for a Development Permit for Operational Works for services shall be obtained
prior to commencement of works.
102. A reticulated water supply system shall be provided to connect to Council’s existing systems,
including a metered water connection to the property boundary of each proposed new lot
within the site. All fees for the supply of water meters shall be paid to the Council.
103. Fire hydrants are to be provided throughout the development in accordance with Council and
Queensland Fire Service standards.
104. Provision shall to be made in all parks locations for a water connection and should conform to
the recommendations of the Bushfire Management Plans. Under-road service conduits shall
be provided to ensure a connection is available.
Power, Telecommunications and Street Lighting
105. Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to
Council.
106. All lots are to be connected to underground power and telecommunications.
107. An underground electricity service shall be provided to each lot if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of the proposed lots.
108. Street lighting and pathway lighting throughout the subdivision shall have a high energy
efficient rating to the reasonable satisfaction of Council and shall generally be provided in
accordance with the principles of Council’s Engineering Design Standards, section 11.3.3.
109. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of new telephone services to the proposed lots. In this regard written confirmation
from an approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan of Survey.
Engineering Works Designs
110. A suitably qualified Registered Professional Engineer, specialising in hydraulics shall prepare
engineering drawings and specifications for stormwater designs and shall be submitted in
conjunction with an application for a Development Permit for Operational Works.
111. All designs for engineering works involving the construction of pavements, kerb and channel,
vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage
reticulation shall be prepared generally in accordance with the requirements of Council's
Engineering Design Standards (except where affected by the Water Sensitive Urban Design
Principles), shall reference where applicable to Council’s Standard Drawings and shall
incorporate best engineering practice.
Page 18 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 123 KB (small file)
- File type
No other editions are linked here.