112. Prior to Council endorsing a Plan of Survey, a certificate from a registered Professional Civil
     Engineer shall be submitted to Council for each Development Permit for Operational Works
     issued pursuant to this permit. The engineer shall certify that he has supervised those works
     and that they have been completed in a workman like manner in accordance with good
     engineering practice and in accordance with that permit.
113. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
     specifications for all engineering works, which shall be submitted in conjunction with an
     application for a Development Permit for Operational Works. In this regard a DXF/DWG file
     on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with
     any application for Operational Works. To facilitate production of As Constructed drawings it
     is suggested that all design drawings are submitted in the Asset Design and As Constructed
     (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au ).
114. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
     for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
     type of all services and structures. All of which shall be submitted to Council for checking and
     for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
General
115. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
     Stock Route Management) Act 2002 are to be controlled on the site prior to Council
     endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
     pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
     threaten environmentally significant areas of the site such as riparian zones and areas of
     natural vegetation.
      Where class 3 plants are removed as a result of this condition and there is not sufficient
      natural regeneration of native species, the areas shall be replanted with endemic native
      species so that a sustainable natural ecosystem is restored.
      Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
      weed treatment and replanting is complete.
116. The following steps shall be undertaken prior to commencement of any construction:-
      116.1.The Principal Contractor shall give Council's Inspector seven (7) days' notice of
            intention to commence works.
      116.2.The Principal Contractor or any of his subcontractors shall not undertake any works
            unless each contractor has public liability insurance in the sum of $10,000,000 and
            copies of current public liability insurance policies are submitted to Council’s inspector.
      116.3.The Principal Contractor shall nominate a site representative and give a telephone
            number that can reach the site representative at any time during a 24-hour day.
      116.4.The site representative shall arrange to meet on-site with Council's Inspector to obtain
            Council's requirements for construction of access.
      116.5.All signage, including that for safety during construction, shall be in accordance with the
            Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads
            Division) Roadworks Signing Guide.



                                                                                    Page 19 of 27

Used in these records

About this file

File size
123 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published].pdf · 123 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.