Land Development Earthworks 54. 55. The earthworks for the new proposal shail be less than the CAS as it was evident that the level of earthworks previously approved was not sustainable due to the impacts caused by the loss of sediments from the site and the problems encountered with uncovering boulders. Please provide details of how earthworks will be reduced in the new proposal. . The amount of disturbance caused by earthworks is made up of works as follows: a. Excavation for underground services; b. Cut and fill for building platforms; c. Cut and fill for roadways; and d. Excavation for building foundations. Item a would be expected to be similar to the CAS. Item b is estimated to be less that the CAS as all the Villas are designed to sit upon the land as lightweight structures. It is therefore envisaged only minor earthworks to allow access for excavation of pad footings and incoming services will be carried out to the areas of the associated with these accommodation types. The larger apartment buildings have been designed with only one level of carparking below the units. It is expected that these units will be generally in cut with any excess fill being used to fill the current excavation under Building | (N). It is noted that prior to construction commencement the contaminated fill area (estimated at 5000m") will be removed from site. The accommodation buildings in this area are expected to require only minor cut and fill in the area of the current contaminated soil cell. Item c is expected to be similar to the CAS. With regard to Item d, as hillside Villas are expected to site on pad footings and the larger apartment buildings are expected to be found in piles or pier footings the amount of excavation is likely to be similar to the CAS. Therefore considering the work that has recently been completed in stabilising the site and the new design of all buildings it is expected that disturbance of the site be earthworks will be less, if not substantially less, than the CAS, which has included substantial excavation for up to 3 levels of basement carparking. Preliminary earthwork plans showing the amount of cut and fill across the site are provided as Attachment 19. It is noted that these plans still reflect the original building design, with updated plans to be submitted as part of the Operational Works application to Council. Please provide details of the earthworks for the site. An A3 plan for each cross-section should be provided showing the amount of cut and fill and clearly showing the existing natural surface level (N.S.L). It appears in some of the cross-sections provided that the N.S.L being Shown is not the current stabilised N.S.L on site. Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0823 - Applicant's Response to Information Request including Attachments [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.