55. 56. 56. Drawings have been prepared for the preliminary bulk earthworks based on the amended Architectural plans. These plans are included in Attachment 19 and reflect the stabilised surface level. Due to the conceptual nature of a Material Change of Use of Premises application, the request for this level of detail is considered excessive. This information will be submitted as part of the Operational Works application to Council. There appears to be cuts of up to 6 metres below natural surface level. Provide details as to how this level of cut complies with Overall Outcome 14.136.2 of the Earthworks Code. As detailed in Item 54, due to the lightweight construction of the Villa units and reduction in basement parking within the larger buildings, the development does not propose significant cuts across the site. Generally, the proposed level of cut does not exceed 2 metres, with only one cut of 6 metres are proposed. This cut is located at the rear of the compactus unit adjacent to Building V. Overall Outcome 14.136.2 of the Earthworks Code seeks: a) To ensure that earthworks do not unreasonably impact on the natural environment or other properties with regard to- i land stability (including differential settlement or expansion in reactive soils; ii. contamination of land: iii. flooding and drainage; iv. groundwater, watercourses and wetlands; v. loss of native remnant or regrowth vegetation; and b) Earthworks are designed and constructed to be structurally sound. It is considered that this area to the rear of the Central Facilities Building will not unreasonably impact on the natural environment or other properties as it is located:- + towards the centre of the site; + clear of the contaminated cell (which is proposed to be removed prior to earthworks being undertaken); + in an area not anticipated to experience flooding and/or drainage concerns; * — clear of the creek buffer area; + within an area already cleared for development. All works associated with this area will be structurally sound, with further detail to be submitted as part of the Operational Works application to Council. Page 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0823 - Applicant's Response to Information Request including Attachments [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.