Council archive · source document
06/0823 - Applicant's Response to Information Request including Attachments [As Published] · 132006.823
Very large file (42.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
57. An estimate of volumes of earth to be removed for each building or roadway should also be provided in tabular format. This table could have a comparison to the CAS earthworks requirements. It is recommended an indication of staging of earthworks also be given in this tabular format. 57. Due to the conceptual nature of a Material Change of Use of Premises application, the request for volumes of earth to be removed for each building and roadway is considered excessive. This information will be submitted as part of the Operational Works application to Council. However, it can be confirmed that the volume of earthwork proposed for the current proposal, is significantly less than that proposed for the CAS. Due to the lightweight construction of the Villa units and reduction in basement excavation, it is anticipated that no fill will be required to the brought onto, or removed from the subject site. Instead preliminary earthwork investigations reveal that the proposed levels of cut and fill across the site will enable earth to be ‘pushed around’. With regard to Council’s request for a indication of Earthworks staging, it is confirmed that the development will be undertaken in four stages: 1. Excavation for underground services; 2. Cut and fill for building platforms; 3. Cut and fill for roadways; and 4. Excavation for building foundations. The regime to control this work will be as was recently successful on the site stabilisation work. The applicant's on-site representative will hold a weekly review meeting with Council Officers and will then instruct the Contractor on any issues that the Council has raised. 58. Please detail any risks associated with slip across the subject site. 58. Previous investigations of the subject site by Golder Associates found that there is a Low Risk of instability across existing natural slopes. During earthworks for the CAS Central Facilities basement, instability was encountered within steep cuttings (ie. man-made slopes) greater than 3 m deep that intersected clays of low strength. These cuttings were located in areas of deeper soil across the flatter parts of the subject site. Although there is a High Risk of instability associated with uncontrolled earthworks in this area, the level of risk will be reduced to an acceptable level to enable the proposed development, subject to the implementation of engineering measures as outlined in Section 6.0 of Golder Associates report titled Geotechnical Investigation, Viridian Noosa, Stage 3, Noosa Heads Queenstand. A copy of this report can be provided upon request. Stormwater Management Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0823 - Applicant's Response to Information Request including Attachments [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.