4.1.4 STORMWATER QUALITY MANAGEMENT STRATEGY
An erosion and sediment control management plan that is endorsed by an CPESC or RPEQ will be
prepared and implemented during construction phase. Erosion and sediment control measures may
include, but not limited to, devices such as:
catch drains,
diversion drains,
silt fences, and
construction entry/exit pads.
4.1.5 MONITORING & MAINTENANCE
The general requirement of monitoring during the construction phase will be:
Work activities to be restricted to designated construction areas.
Earthworks and site clearing to be undertaken in accordance with the Erosion and Sediment
Control Plans prepared during detailed design phase.
Erosion and sediment control devices to be constructed in accordance with the Erosion and
Sediment Control Plans prepared during detailed design phase.
Inspect sediment fences and erosion and sediment control structures/devices on a weekly basis as
well as after any rain event exceeding 25mm in 24hrs.
Stormwater discharges from the site are not to have any adverse effect on the downstream
environment.
Monitor and record of the performance of the drainage control devices including water quality
testing where required.
Any failure in the stormwater system to be immediately rectified to prevent uncontrolled
discharge from the site.
Any failure to the stormwater system causing damage to surroundings should implement
immediate remedial work to the damaged area.
4.1.6 RESPONSIBILITY & REPORTING
The contractor shall be responsible for monitoring the performance of all drainage control and
erosion and sediment control devices.
Records of any failures to devices should be kept and reported to the Construction Manager.
Regular inspections of the devices shall be reported to the Construction Manager.
Inspections of the devices after heavy rainfall shall be reported to the Construction Manager.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e | 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.