Original source · versioned page text
Reference Documents - MCU23 0070
Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
4.2 OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT The development footprint is 486m² which is less than 2,500m². Therefore, the site does not trigger compliance with the State Planning Policy (2017) for stormwater quality management and meeting the required Water Quality Objectives (WQOs). The development is also not discharging into ‘High Ecological Value’ waters. On that basis, no conventional stormwater improvement devices such as bioretention are proposed and MUSIC modelling has not been undertaken for the site. While no active stormwater treatment measures such as bioretention is proposed, the site will have some passive stormwater quality treatment measures. For instance, most of the site is covered by the building footprint and most of the building runoff is directed into a detention tank. Most of the gross pollutants such as tree leaves and visible rubbish will be captured in the roof gutters. Smaller gross pollutants and Suspended Solids that travel through the roof drainage system will enter the detention tank where runoff will pond for a period of time allowing the pollutants to settle into the bottom of the bank. Periodic maintenance of the roof drainage system and the detention tank will ensure most of the gross pollutants and Suspended Solids are captured within the site prior to discharging into the downstream drainage network. The landscaping proposed within the site will also provide water quality benefit to runoff that is directed to them. The vegetation will capture primary pollutants and the soil underneath will provide some level of nutrient treatment. 4.3 WATERWAY STABILITY MANAGEMENT The waterway stability management in accordance with the State Planning Policy (2017) is not applicable for this site, as the site flows are connected to an urban underground drainage network which then discharges into tidal waters. SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH P a g e | 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.