Council archive · source document
Engineering Services Assessment · MCU15/0122
Attached to the e-mail MCU15/0122 Development Application - Engineering Services Assessment Email 5 of 5.
Very large file (10.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 27, section 1. The text section number identifies this passage in the reader.
O15 S15.1 A registered easement in favour of RO15 Refer RO14.
Maintenance access is provided to all sewers, water Council is created over all underground
mains, stormwater drains, overland flow paths and infrastructure located in private property;
associated structures. AND
S15.2 The width of the easement is the
greater of 3m or the width of the zone of
influence;
AND
S15.3 The easement is centred over the
centreline of the infrastructure.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Services Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.