Original source · versioned page text
Appendix L - Code Assessment.pdf
Performance Outcomes Acceptable Outcomes Response
new ideas, concepts and sketch
designs for stormwater filtration
systems (Healthy Waterways
Water by Design).
AO11.5 Not Applicable
Floodplain management is Development is not in a
designed in accordance with the floodplain.
Framework for the Integration of
Flood and Stormwater
Management into Open Space
published by Healthy Waterways
Water by Design (version current
at the time of development
application).
PO12 AO12.1 AO12.1 Complies
Development protects in-stream Where run-off from or within the Refer to Appendix F & G for
ecology by maintaining pre- site passes through or drains to further detail.
development low flow discharge natural channels, waterways or
regimes and maintaining fish wetlands, development protects
passages. in- steam ecology by maintaining
pre-development low flow
discharge regimes in accordance
with the frequent flow
management objectives in PSP6
Engineering Design Standards -
Roads, drainage and earthworks
AO12.2 Not Applicable
Instream structures such as No instream structures are
roads, bridges, culverts, and proposed.
other stormwater infrastructure
do not cause barriers to fish
passage and facilitate the
movement of terrestrial and
aquatic fauna along waterway
corridors.
AO12.3 AO12.3 Complies
Benthic substrate retains a Refer to Appendix F & G for
continuous grade with the further detail.
direction of flow consistent with
the natural bed profile.
PO13 AO13.1 AO13.1 Complies
URBIS
FINAL TOWN PLANNING REPORT - 47 GOODCHAP STREET 121
PLANNING SCHEME CODE ASSESSMENT
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix L - Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.