Original source · versioned page text
Appendix F- State Code 1
Performance outcomes Acceptable outcomes Response
PO38 Reconfiguring a lot minimises free field AO38.1 Development provides noise barrier or Not applicable.
noise intrusion from a state-controlled road. earth mound which is designed, sited and
constructed:
1. to achieve the maximum free field acoustic
levels in reference table 2 (item 2.1);
2. in accordance with:
a. Chapter 7 integrated noise barrier design
of the Transport Noise Management
Code of Practice: Volume 1 (Road Traffic
Noise), Department of Transport and
Main Roads, 2013;
b. Technical Specification-MRTS15 Noise
Fences, Transport and Main Roads,
2019;
c. Technical Specification-MRTS04 General
Earthworks, Transport and Main Roads,
2020.
OR
AO38.2 Development achieves the maximum free
field acoustic levels in reference table 2 (item
2.1) by alternative noise attenuation measures
where it is not practical to provide a noise barrier
or earth mound.
Material change of use (accommodation activity)
Ground floor level requirements adjacent to a state-controlled road or type 1 multi-modal corridor
PO39 Development minimises noise intrusion from AO39.1 Development provides a noise barrier or Not applicable.
a state-controlled road in private open space. earth mound which is designed, sited and
constructed:
1. to achieve the maximum free field acoustic
levels in reference table 2 (item
2.2) for private open space at the ground
floor level;
2. in accordance with:
State Development Assessment Provisions v3.0
State code 1: Development in a state-controlled road environment Page 10 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.