Original source · versioned page text
Appendix F- State Code 1
Performance outcomes Acceptable outcomes Response
Involving the creation of 5 or fewer new residential lots adjacent to a state-controlled road or type 1 multi-modal corridor
PO37 Development minimises free field noise AO37.1 Development provides a noise barrier or Complies.
intrusion from a state-controlled road. earth mound which is designed, sited and
constructed: The new lot is within a compliant noise impact
1. to achieve the maximum free field acoustic area (category 0).
levels in reference table 2 (item 2.1);
2. in accordance with:
a. Chapter 7 integrated noise barrier design
of the Transport Noise Management
Code of Practice: Volume 1 (Road Traffic
Noise), Department of Transport and
Main Roads, 2013;
b. Technical Specification-MRTS15 Noise
Fences, Transport and Main Roads,
2019;
c. Technical Specification-MRTS04 General
Earthworks, Transport and Main Roads,
2020.
OR
AO37.2 Development achieves the maximum free
field acoustic levels in reference table 2 (item
2.1) by alternative noise attenuation measures
where it is not practical to provide a noise barrier
or earth mound.
OR
AO37.3 Development provides a solid gap-free
fence or other solid gap-free structure along the
full extent of the boundary closest to the state-
controlled road.
Involving the creation of 6 or more new residential lots adjacent to a state-controlled road or type 1 multi-modal corridor
State Development Assessment Provisions v3.0
State code 1: Development in a state-controlled road environment Page 9 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.