Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Appendix F- State Code 1

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Table 1.4 Filling, excavation, building foundations and retaining structures
 Performance outcomes                                             Acceptable outcomes                                              Response
 PO31 Development does not create a safety                        No acceptable outcome is prescribed.                             Not applicable.
 hazard for users of the state-controlled road or
 road transport infrastructure.                                                                                                    No earthworks or built form proposed.
 PO32 Development does not adversely impact the                   No acceptable outcome is prescribed.                             Complies.
 operating performance of the state-controlled
 road.                                                                                                                             Refer to response to PO1 and PO31.

 PO33 Development does not undermine, damage                      No acceptable outcome is prescribed.                             Complies.
 or cause subsidence of a state-controlled road.
                                                                                                                                   Refer to response to PO1 and PO31.

 PO34 Development does not cause ground water                     No acceptable outcome is prescribed.                             Complies.
 disturbance in a state-controlled road.
                                                                                                                                   Refer to response to PO1 and PO31.

 PO35 Excavation, boring, piling, blasting and fill               No acceptable outcome is prescribed.                             Complies.
 compaction do not adversely impact the physical
 condition or structural integrity of a state-                                                                                     Refer to response to PO1 and PO31.
 controlled road or road transport
 infrastructure.
 PO36 Filling and excavation associated with the                  No acceptable outcome is prescribed.                             Complies.
 construction of new or changed access do not
 compromise the operation or capacity of existing                                                                                  Refer to response to PO1 and PO31.
 drainage infrastructure for a state-controlled
 road.



Table 1.5 Environmental emissions
Statutory note: Where a state-controlled road is co-located in the same transport corridor as a railway, the development should instead comply with Environmental emissions in State code 2:
Development in a railway environment.
 Performance outcomes                                             Acceptable outcomes                                             Response
  Reconfiguring a lot
State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                                                                    Page 8 of 18
Log in to download the original file

Appendix F- State Code 1.pdf · 220 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.