Original source · versioned page text
2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
• 4GY – Noosa Estuary
• Noosa Today – Noosa Estuary
• Mirage News – Noosa Estuary
• Noosa Today – Noosa Estuary
• Noosa Today – Noosa Estuary
• Noosa Today – Noosa Estuary
• ABC Sunshine Coast FM - Noosa Estuary
• 91.7 ABC Coast FM - Noosa Estuary
• Noosa Today – Noosa Estuary
• Noosa Today - Noosa Estuary May 2022 9,150
• Central Queensland Today - Noosa Estuary June 2022 11,020
• ABC Sunshine Coast FM – Noosa Estuary August 2022 85,423
• ABC Sunshine Coast FM – Noosa Estuary
• ABC Sunshine Coast FM – Noosa Estuary
• Noosa Today – Noosa Estuary
Example of a media post associated with the reef construction works is given below (Figure 15).
Figure 15: Social media post of the barge on the Noosa River (2 September 2022)
35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.